  • [FILED] Timelines and Standard Timelines in CiviCase
Pages: [1]

Author Topic: [FILED] Timelines and Standard Timelines in CiviCase  (Read 1340 times)

Upperholme

  • Administrator
  • Ask me questions
  • *****
  • Posts: 568
  • Karma: 8
    • MC3
  • CiviCRM version: 4.x
  • CMS version: Drupal 6.x/7.x, Wordpress, Joomla
[FILED] Timelines and Standard Timelines in CiviCase
August 20, 2014, 09:16:28 am
When creating a new Case Type, the user is presented with a screen that has a Standard Timeline in place, complete with an Open Case Activity Type already included, and ready to be populated with other activity types. According to the documentation, which I'm working on now, the only difference between a 'Standard Timeline' and a 'Timeline', is that the Standard timeline must include an Open Case activity at its start. There doesn't seem to be any other requirement or difference, perhaps other than that the user can add non-standard timelines to an existing case, but can't add a standard timeline.

I note that I can delete the Standard Timeline from my Case Type set-up screen, and the Open Case activity along with it. I've done this, and instead created a Sequence. The sequence has just one activity in it - a phone call. I can save this case type and create a case using this case type. The case summary screen shows my phone call activity.

So this appears to show that I don't need an Open Case activity type at all. After all, I've got a case, and I've just successfully logged a Meeting activity and filed it on the case I've created. So I'm unclear as to the importance or value of the Open Case activity type, or indeed the Standard Timeline.

Searching the activities, I can see that the Meeting activity that I've just created is actually two activities (id = 635 and 636, both created at the same time). One of them (id = 635) is listed as having the subject "(Filed on case 2)". Not sure why there should be two activities created here?

To test things further I created another new case type, again with no standard timeline, and in this one had a (normal) timeline with two activity types - a meeting and a phone call. In terms of scheduling the activities I set it so that the meeting was scheduled 1 day prior to the phone call, and the phone call 1 day after the meeting. Again this case type was accepted and I've successfully set up a case using it.

And i realise that having deleted my Standard Timeline, there is no way to get it back.

To summarise, the case configuration seems happy enough to go along with my choices, and I'm left wondering what the rules are, if any. Should I have a Standard Timeline, do I need to include an Open Case activity type (and if so, why did CiviCRM let me remove these things without complaining). Or are these concepts in place purely to help the user to set up case types that are more likely to work for them?


« Last Edit: August 27, 2014, 01:35:55 pm by Coleman Watts »
Graham Mitchell
http://mc3.coop

joanne

  • Administrator
  • Ask me questions
  • *****
  • Posts: 852
  • Karma: 83
  • CiviCRM version: 4.4.16
  • CMS version: Drupal 7
Re: Timelines and Standard Timelines in CiviCase
August 20, 2014, 05:08:23 pm
There is an issue for this https://issues.civicrm.org/jira/browse/CRM-15125.

The new case configuration UI will really open CiviCase up to administrators.

As a admin newbie to CiviCase my personal preference would be to remove the options to delete both the standard timeline and the open case activity in the standard timeline.

totten

  • Administrator
  • Ask me questions
  • *****
  • Posts: 695
  • Karma: 64
Re: Timelines and Standard Timelines in CiviCase
August 21, 2014, 06:11:19 pm
FWIW, Joanne and I had some discussion about the Standard Timeline several days ago on IRC, and I looked to see how the "Standard Timeline" gets its significance. This may be useful to know in future discussions:

 A) The *first* timeline in the CaseType is used to auto-populate new cases. When you make a new CaseType using the old process (copying/editing an example XML file) or the new process (GUI), the "Standard Timeline" will be first by default.
 B) The *name* should be "standard_timeline" because that is hard-coded in a few places (e.g. CRM/Case/Form/Activity/ChangeCaseStartDate.php and templates/CRM/Case/Form/CaseView.tpl). I'm not sure why this is or how important it is.

The most predictable configuration is the default one -- ie the standard timeline is both (a) the first and (b) named "standard_timeline".

I'm softly +1 on preventing users from deleting "standard_timeline" because it's the quickest way to prevent mistakes given the current constraints, but I think the real problem is the underlying complexity of A+B.

Upperholme

  • Administrator
  • Ask me questions
  • *****
  • Posts: 568
  • Karma: 8
    • MC3
  • CiviCRM version: 4.x
  • CMS version: Drupal 6.x/7.x, Wordpress, Joomla
Re: Timelines and Standard Timelines in CiviCase
August 21, 2014, 11:25:47 pm
Given the concerns over potential problems when/if the standard timeline and/or open case activity type get deleted, and given that this new GUI-based approach is new for all of us - even those of use who have been working with CiviCase for sometime, I'm wondering whether it might be sensible if for the first release users are prevented from deleting standard_timeline.
Once the usability improvements are in place in 4.6 (or hopefully earlier) then I think there will be less scope for problems, plus the interface will have been more thoroughly road tested by that stage, and the restriction on deletion could be removed if it is deemed sensible to do so.
Graham Mitchell
http://mc3.coop

Upperholme

  • Administrator
  • Ask me questions
  • *****
  • Posts: 568
  • Karma: 8
    • MC3
  • CiviCRM version: 4.x
  • CMS version: Drupal 6.x/7.x, Wordpress, Joomla
Re: Timelines and Standard Timelines in CiviCase
August 21, 2014, 11:28:49 pm
Update: Having checked the issue status on Jira I see you're ahead of the game and have already implemented this.
Graham Mitchell
http://mc3.coop

sandeepmohanty

  • I’m new here
  • *
  • Posts: 14
  • Karma: 0
  • CiviCRM version: 4.5.3
  • CMS version: Drupal 7.32
  • MySQL version: 5.5.40
  • PHP version: 5.3.10
Re: Timelines and Standard Timelines in CiviCase
February 26, 2015, 05:07:04 am
Quote from: Upperholme on August 21, 2014, 11:28:49 pm
Update: Having checked the issue status on Jira I see you're ahead of the game and have already implemented this.


Is it possible to add civicrm activity in drupal Rule?

Pages: [1]
  • CiviCRM Community Forums (archive) »
  • Old sections (read-only, deprecated) »
  • Discussion (deprecated) »
  • Alpha and Beta Release Testing »
  • 4.5 Release Testing »
  • [FILED] Timelines and Standard Timelines in CiviCase

This forum was archived on 2017-11-26.