CiviCRM Community Forums (archive)

*

News:

Have a question about CiviCRM?
Get it answered quickly at the new
CiviCRM Stack Exchange Q+A site

This forum was archived on 25 November 2017. Learn more.
How to get involved.
What to do if you think you've found a bug.



  • CiviCRM Community Forums (archive) »
  • Old sections (read-only, deprecated) »
  • Discussion (deprecated) »
  • Alpha and Beta Release Testing »
  • 2.1 Release Testing »
  • Problem editing dates
Pages: [1]

Author Topic: Problem editing dates  (Read 1644 times)

dcalp

  • I’m new here
  • *
  • Posts: 17
  • Karma: 0
Problem editing dates
September 09, 2008, 09:37:42 am
Hi:
I found a problem editing dates with a specific date format, ie relationships start-end date.

If I format the date entry format to %d/%m/%Y when I enter to edit a date the month is not recognized, instead the month number the -month- option of the drop down is displayed. If you save the changes, an error is yield.

This happen to me also in custom field dates.

Verified in the sandbox.

Thanks a lot!

Diego

Dave Greenberg

  • Administrator
  • I’m (like) Lobo ;)
  • *****
  • Posts: 5760
  • Karma: 226
    • My CiviCRM Blog
Re: Problem editing dates
September 09, 2008, 01:14:39 pm
There's an open issue scheduled for resolution in 2.2. Currently the date input fields do not function properly with non-default date formats / date elements.

http://issues.civicrm.org/jira/browse/CRM-3087
Protect your investment in CiviCRM by  becoming a Member!

Pages: [1]
  • CiviCRM Community Forums (archive) »
  • Old sections (read-only, deprecated) »
  • Discussion (deprecated) »
  • Alpha and Beta Release Testing »
  • 2.1 Release Testing »
  • Problem editing dates

This forum was archived on 2017-11-26.